Skip to content

Phase 2d: Work-driven auto-connect when work requires a link #60

Description

@itsniper

Parent: #51

Requirements

  • When work requires a connection, auto-connect without Advanced connect (FR-11.1 / FR-4.4 end-state).
  • Until FR-4 commands exist, planning may define an interim “work pending” API or test hook; product end-state is non-empty per-peripheral command queue.
  • Integrates with idle (2b) and Approach B (2c).

Acceptance criteria

  • Documented way for work to drive connect without Advanced hold
  • Auto-connect uses ensure-linked + PoweredOn rules
  • Quiet after work → idle path applies
  • Tests for auto-connect + idle cycle

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementNew feature or request

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions