Skip to content

Landing spot for summarizer input descriptions #365

Description

@marcverhagen

There are some notes in the inspector repository on the input to the summarizer at https://github.com/clamsproject/mmif-inspector/blob/main/docs/developer-notes.md.

Since that repository is not about the summarizer anymore I want to move them and I am collecting candidates for landing spots. I see two candidates in this repository:

  • a new docs directory inside the summarizer package
  • the mmif-python documentation.

Any other candidates?

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    • Status
      Todo

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions