Skip to content

Verification of traceability #298

Description

@MarcBehrens

To answer the question: Which requirement is covered by the design model (one direction)
it is agreed to have the operators linked within the SCADE requirements gateway.

It is agreed to have from top model level either summing up packages (100%) or its additional operators as far as possible.

All requirements need to be linked according to: https://github.com/morido/subset026reqif.

One model part already applied within the SCADE requirements gateway is: Calculate Train Position

An update of the wikipage is planned: https://github.com/openETCS/validation/wiki/Traceability-in-SCADE-Suite-Models

feedback is planned by @BerndHekele

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions