Skip to content

feat: project completion executable path (Phases 0-8, 10-11) - #70

Merged
Aparnap2 merged 10 commits into
mainfrom
chore/project-completion-gap-audit
Sep 27, 2026
Merged

Aparnap2 merged 10 commits into
mainfrom
chore/project-completion-gap-audit

Conversation

@Aparnap2

Copy link
Copy Markdown
Owner

Project completion: executable path Phases 0–8, 10–11 (no architecture changes)

Gate summary

  • 3441 passing, 13 categorized pre-existing failures (K1 waived; 4 LLM-network; 2 ministack; 4 py-runtime-api; 1 matcher; 1 migrations; 1 stripe-purity). Zero new failures in any slice.
  • P6/P7/P8 frozen contracts untouched — integration at boundaries only; no new authority, no Temporal/cloud/LLM in deterministic paths.
  • Phases complete: 0 gap audit (23 gaps) → 1 P6 slice (19 tests) → 2 P7→P6 handoff (7) → 3 P8→P7 Fake/Replay (9) → 4 PG durability + migration (5) → 5 POST /execute + /verify (9) → 6 adversarial (16 attacks) → 7 golden LLM eval, deterministic (14 cases, 5 tests) → 8 observability (11) → 10 acceptance plan (10 scenarios) → 11 readiness report (decision: NOT READY).
  • Staging is the next milestone. Production claim stays: deterministic control plane + bounded model runtime + evaluated advisory agent plane.

Pre-existing issues (documented, not fixed here)

  • Fresh-DB tenant/stripe breakages: fix before production; CI must migrate/seed first.
  • Dual approval stacks: consolidate before production.
  • finance/llm/ bypass stack: quarantine before production.
  • K1: standing waiver kept. Live-LLM eval: mandatory before production claim.

Full evidence: docs/architecture/PROJECT_COMPLETION_GAP_AUDIT.md, docs/release/PRODUCTION_READINESS.md, per-slice atomic commits on this branch.

@Aparnap2 Aparnap2 self-assigned this Sep 27, 2026
@coderabbitai

coderabbitai Bot commented Sep 27, 2026

Copy link
Copy Markdown

Important

  • 🔍 Trigger review

This repository does not receive automatic reviews because it has fewer than 10 stars.

⚙️ Run configuration

Configuration used: defaults

Review profile: CHILL

Plan: Advanced

Run ID: 7173b4ff-21e1-432f-bbd4-e6908835595d


Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands.

@Aparnap2
Aparnap2 merged commit a455433 into main Sep 27, 2026
2 of 8 checks passed
@Aparnap2
Aparnap2 deleted the chore/project-completion-gap-audit branch September 27, 2026 23:03
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant