Repository files navigation

Open Engineering Notes

Open Markdown companion resources for data center engineering practice, maintained alongside DataCenterGuidelines.com.

DataCenterGuidelines.com is the canonical published engineering knowledge base. This repository is the open Markdown companion layer: guides, specification companions, control-sequence companions, point lists, commissioning resources, functional testing resources, and working or experimental notes. It is not a software product.

Where a resource exists on both the website and in this repository, the web resource is authoritative. This repository follows the same engineering taxonomy as the website and does not define a second competing information architecture.

Content remains vendor-neutral.

Maintainer: Fatih Gündoğan

Disclaimer

These notes are not a standard, a certified design document, a code requirement or a vendor-specific recommendation. They do not replace IEC, ASHRAE, IEEE, Uptime Institute or other authoritative sources.

For safety-critical and mission-critical systems, project-specific validation by a qualified engineer of record is required. Adapt every companion document to the adopted codes, the owner’s availability objectives and the as-designed controls architecture.

What’s in this repository

Folder Role
guides/ Open companion guides and working notes on architecture and operating philosophy
specifications/ Specification companions aligned with published website specifications
functional-testing/ Functional test companions and failure-mode review checklists
commissioning/ Commissioning readiness and related commissioning companions

Folders such as control-sequences/, point-lists/ and notes/ are reserved for the website taxonomy and are created only when this repository has matching content.

Start here

  1. UPS architecture
  2. BMS monitoring architecture
  3. BMS communication failure test
  4. BMS controller and server failure test
  5. Commissioning readiness
  6. Controls failure-mode checklist

Also see flywheel vs lithium UPS, DLC coolant chemistry monitoring and the chilled-water pump VFD specification companion.