73 changes: 72 additions & 1 deletion docs/design/FEATURE_COMPLETE_ROADMAP.md
Original file line number Diff line number Diff line change
Expand Up @@ -23,6 +23,73 @@ This roadmap covers the **remaining gaps** to achieve full RFC compliance and ad

Items are ordered by phase and priority; which release they land in is decided when the release is planned. Work that has to break the API is marked as v4.0 material where it appears.

### Funding, and how it relates to these estimates

Part of this roadmap is funded through the [NGI Zero Core](https://nlnet.nl/core)
fund, established by [NLnet](https://nlnet.nl/) with financial support from the
European Commission's [Next Generation Internet](https://ngi.eu/) programme, under
the aegis of DG Communications Networks, Content and Technology. The MoU allocates
365 hours to this library. Three things about that number need saying plainly,
because a reader who puts the MoU's line items next to this document's estimates
will otherwise draw the wrong conclusion.

TODO: add the MoU's signing date and a public link to the NLnet project page here
as soon as they exist. Until then the MoU figures below cannot be checked against
anything outside this repository.

**1. The MoU's estimates are more optimistic than this document's, deliberately so.**
For the seven items below, the MoU line is at or below this roadmap's *low*
estimate, and for several it is far below:

| Item | MoU | This roadmap |
|---|---|---|
| 1.1 WebDAV ACL (RFC 3744) | 16 h | 40-60 h |
| 1.2 Improved scheduling (RFC 6638) | 6 h | 40 h |
| 1.3 Calendar availability (RFC 7953) | 8 h | 16-24 h |
| 2.1 Negated searches | 6 h | 12-16 h |
| 4.2 Recurrence handling | 20 h | 24-32 h |
| 4.3 + 4.4 + 5.2 (as one "other issues" line) | 15 h | 32-48 h |
| 7.1 + 8.1 + 8.2 + 8.3 (as one "code quality" line) | 30 h | 80+ h |

The rest — RFC 7986, multiget, collations, managed attachments, sharing, extended
MKCOL, quota, WebDAV Push, collision avoidance, retry logic — sits inside this
roadmap's ranges.

Two MoU lines run the other way, and they are why chapter 7 looks unfunded here:
documentation is funded at 100 hours — 60 for keeping the documentation in sync
with the work above, plus two 20-hour lines for documentation issues and for
further documentation work — against this roadmap's 40-64 hours for **7.2 Server
Documentation** and **7.3 Example Code and Tutorials**. A further 4-hour line
covers continued work on incoming issues and compatibility, which is ongoing
maintenance rather than a roadmap item and has no counterpart in this document.

The gap is not an error in either document. The MoU funds *a useful increment* of
each item, not each item to completion; this roadmap estimates each item to
completion. A funded line of 16 hours against an estimate of 40-60 means the ACL
work will be started and partly delivered, not that it will be finished for 16
hours. Where an item cannot be usefully partly delivered, that will be noted on
the item itself.

**2. This roadmap begins after v3.3.0, and the v3.3.0 release is funded separately.**
The MoU carries a 12-hour line for cutting that release. It is not an item in this
document, which is scoped as work *beyond* v3.3 — but it is charged to the same
grant, and it comes first.

**3. Some of this roadmap is deliberately outside the funded scope.** Nothing in
the MoU corresponds to:

- **5.1 DNSSEC validation** — dropped from the funded scope as a deliberate call by
the maintainer: low value for the money, given how few deployments would benefit
- **5.3 TLS enforcement** — small enough to fall out of other work
- **Phase 6, jCal and xCal** — covered elsewhere in the ecosystem; the MoU funds
xCal support in the `icalendar` library and an `icalendar-converter` package
- **8.4 Internal refactoring backlog** and **8.5 Packaging and HTTP dependencies** —
wanted, unfunded

The MoU's own summary line for this library says it "covers only parts of the
roadmap", and that is the accurate reading: it is a selection across chapters 1-5,
7 and 8, not a prefix ending at some chapter number.

---

## Phase 1: RFC Compliance - Core Features
Expand Down Expand Up @@ -325,6 +392,10 @@ Also related: [#697](https://github.com/python-caldav/caldav/issues/697) - smart
- **Estimated effort:** 16-24 hours
- **Related issue:** [#571](https://github.com/python-caldav/caldav/issues/571)
- **RFC:** [RFC 6764 Section 8](https://datatracker.ietf.org/doc/html/rfc6764#section-8)
- **Not funded** — deliberately dropped from the NLnet scope as low value for the
money. DNSSEC-signed SRV/TXT records for CalDAV are rare, and a client-side
validator helps only the deployments that already have them. It stays on the
roadmap because it is the right thing to do eventually, not because it is next.

**Tasks:**
- [ ] Add optional DNSSEC validation for SRV/TXT lookups
Expand Down Expand Up @@ -578,7 +649,7 @@ Bugs get fixed when they get fixed; they do not need a phase.
| Medium | Examples/Tutorials (7.3) | 16-24 |
| Medium | Deprecation Cleanup (8.1) | 8-16 |
| Medium | Test Infrastructure (8.2) | 16-24 |
| Low | Multiget Optimization (2.2) | 8 |
| Low | Multiget Optimization (2.3) | 8 |
| Low | Collation Support (2.2) | 8-12 |
| Low | Managed Attachments (3.1) | 24-32 |
| Low | Extended MKCOL (3.3) | 4-8 |