Competing-risks survival analysis of 38,201 US interconnection-queue requests (LBNL): who gets built is predictable on day one (AUC 0.72, 3.7x top-decile lift) — who withdraws is a post-entry story.
Replication material for "Complements in the Queue: What Re-Studying Recovers, and What Only a Joint Interconnection Study Can" — a joint interconnection-allocation engine measuring what segregated generation/load study tracks cost on distribution feeders.
Interactive D3 map of US grid interconnection: a hosting-capacity choropleth with the interconnection queue and ISO/RTO territories overlaid (synthetic demo data).